{"id":6137,"date":"2022-08-24T15:25:44","date_gmt":"2022-08-24T13:25:44","guid":{"rendered":"http:\/\/weekly.uhm.org.mt\/?post_type=article&#038;p=6137"},"modified":"2022-08-24T15:27:25","modified_gmt":"2022-08-24T13:27:25","slug":"il-permessi-tal-bini-qrib-il-livell-ta-qabel-il-covid-19","status":"publish","type":"article","link":"http:\/\/weekly.uhm.org.mt\/en\/article\/il-permessi-tal-bini-qrib-il-livell-ta-qabel-il-covid-19\/","title":{"rendered":"Permits for new dwellings close to Pre-Covid-19 level"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"683\" src=\"http:\/\/weekly.uhm.org.mt\/wp-content\/uploads\/2022\/08\/feature-426-b-1024x683.jpg\" alt=\"\" class=\"wp-image-6138\" srcset=\"http:\/\/weekly.uhm.org.mt\/wp-content\/uploads\/2022\/08\/feature-426-b-1024x683.jpg 1024w, http:\/\/weekly.uhm.org.mt\/wp-content\/uploads\/2022\/08\/feature-426-b-300x200.jpg 300w, http:\/\/weekly.uhm.org.mt\/wp-content\/uploads\/2022\/08\/feature-426-b-768x512.jpg 768w, http:\/\/weekly.uhm.org.mt\/wp-content\/uploads\/2022\/08\/feature-426-b-480x320.jpg 480w, http:\/\/weekly.uhm.org.mt\/wp-content\/uploads\/2022\/08\/feature-426-b.jpg 1254w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>In the first half of this year the number of residential building permits issued were close to the pre-Covid 19 levels, thus suggesting that the construction industry has significantly recovered from the slowdown caused by the pandemic two years ago.<\/p>\n\n\n\n<p>Moreover, the biggest number of dwellings approved between April and June of 2022 were in Siggiewi with 227, followed by Mosta where 122 dwellings were approved and surprisingly Sannat with 111 residential units approved. The geographic distribution of approved dwellings indicates the rapid growth of the construction industry in Gozo, which has fuelled concerns that the unique character of the iconic sister island could be threatened. &nbsp;In the case of Sannat, a village with a population of just 1,913 an overnight addition of more than 100 dwellings might have a huge demographic, infrastructural and social impact.<\/p>\n\n\n\n<p>In total during the second quarter of 2022, 438 building permits were issued comprising 2,164 new dwellings which is higher than any quarter in both 2020 and 2021. This translates to about five dwellings per building permit, meaning that most of the applications were for apartment blocks.<\/p>\n\n\n\n<p>In fact, during the second quarter of this year the majority of new dwellings were apartments (1,527), followed by penthouses (336), maisonettes (191), terraced houses (93) and other units such as bungalows, farmhouses and villas. The total number of approved dwellings was 16.4% higher than in the second quarter of 2021.<\/p>\n\n\n\n<p>From a regional perspective, between April and June the highest number of approved new dwellings was in the Northern Harbour district with 514. This region comprises Birkirkara; Il-G\u017cira; \u0126al Qormi; Il-\u0126amrun; L-Imsida; Pembroke; San \u0120wann; Santa Venera; San \u0120iljan; Is-Swieqi; Ta\u2019 Xbiex; Tal-Piet\u00e0; Tas-Sliema. Gozo ranked second with 479 new dwellings approved. On the other hand the Southern Harbour District (Bormla; Il-Fgura; Floriana; \u0126al Luqa; \u0126a\u017c-\u017babbar; Il-Kalkara; Il-Marsa; Ra\u0127al \u0120did; Santa Lu\u010bija; L-Isla; \u0126al Tarxien; Valletta; Il-Birgu; Ix-Xg\u0127ajra) saw the lowest number with 161 new dwellings approved.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"724\" height=\"1024\" src=\"http:\/\/weekly.uhm.org.mt\/wp-content\/uploads\/2022\/08\/feature-426-724x1024.jpg\" alt=\"\" class=\"wp-image-6139\" srcset=\"http:\/\/weekly.uhm.org.mt\/wp-content\/uploads\/2022\/08\/feature-426-724x1024.jpg 724w, http:\/\/weekly.uhm.org.mt\/wp-content\/uploads\/2022\/08\/feature-426-212x300.jpg 212w, http:\/\/weekly.uhm.org.mt\/wp-content\/uploads\/2022\/08\/feature-426-768x1086.jpg 768w, http:\/\/weekly.uhm.org.mt\/wp-content\/uploads\/2022\/08\/feature-426-1086x1536.jpg 1086w, http:\/\/weekly.uhm.org.mt\/wp-content\/uploads\/2022\/08\/feature-426-1448x2048.jpg 1448w, http:\/\/weekly.uhm.org.mt\/wp-content\/uploads\/2022\/08\/feature-426-scaled.jpg 1810w\" sizes=\"(max-width: 724px) 100vw, 724px\" \/><\/figure><\/div>\n","protected":false},"excerpt":{"rendered":"<p>In the first half of this year the number of residential building permits issued were close to the pre-Covid 19 levels, thus suggesting that the construction industry has significantly recovered [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":6138,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","format":"standard","meta":{"_mi_skip_tracking":false,"spay_email":""},"issuem_issue":[285],"issuem_issue_categories":[9],"issuem_issue_tags":[],"translation":{"provider":"WPGlobus","version":"2.8.8","language":"en","enabled_languages":["mt","en"],"languages":{"mt":{"title":true,"content":true,"excerpt":false},"en":{"title":true,"content":true,"excerpt":false}}},"_links":{"self":[{"href":"http:\/\/weekly.uhm.org.mt\/en\/wp-json\/wp\/v2\/article\/6137"}],"collection":[{"href":"http:\/\/weekly.uhm.org.mt\/en\/wp-json\/wp\/v2\/article"}],"about":[{"href":"http:\/\/weekly.uhm.org.mt\/en\/wp-json\/wp\/v2\/types\/article"}],"author":[{"embeddable":true,"href":"http:\/\/weekly.uhm.org.mt\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"http:\/\/weekly.uhm.org.mt\/en\/wp-json\/wp\/v2\/comments?post=6137"}],"version-history":[{"count":2,"href":"http:\/\/weekly.uhm.org.mt\/en\/wp-json\/wp\/v2\/article\/6137\/revisions"}],"predecessor-version":[{"id":6141,"href":"http:\/\/weekly.uhm.org.mt\/en\/wp-json\/wp\/v2\/article\/6137\/revisions\/6141"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/weekly.uhm.org.mt\/en\/wp-json\/wp\/v2\/media\/6138"}],"wp:attachment":[{"href":"http:\/\/weekly.uhm.org.mt\/en\/wp-json\/wp\/v2\/media?parent=6137"}],"wp:term":[{"taxonomy":"issuem_issue","embeddable":true,"href":"http:\/\/weekly.uhm.org.mt\/en\/wp-json\/wp\/v2\/issuem_issue?post=6137"},{"taxonomy":"issuem_issue_categories","embeddable":true,"href":"http:\/\/weekly.uhm.org.mt\/en\/wp-json\/wp\/v2\/issuem_issue_categories?post=6137"},{"taxonomy":"issuem_issue_tags","embeddable":true,"href":"http:\/\/weekly.uhm.org.mt\/en\/wp-json\/wp\/v2\/issuem_issue_tags?post=6137"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}